Mandarin Hotel at AOL/Time Warner, NEW YORK, N.Y.
Mechanical Construction Services: HVAC Systems Installation
MECHANICAL CONSTRUCTION SERVICES OVERVIEW
Located in the AOL Time Warner complex a complete commercial HVAC system was installed in the north tower of the Mandarin Hotel from the 18th to 36th floor as part of a heating and air conditioning service project. A complete mechanical fit-out of this five star Hotel in the middle of Columbus circle includes 300 fan coil units located on 16 hotel floors. One mechanical room includes over 15 air handling units, a PRV station, hot and chilled water pumps and heat exchanges.